Type | Date

Data Center Move Checklist

End-to-end move playbook: inventory, power/cooling gates, layered cutover, bring-up order, and decommission — so the move is boring on purpose.

A data center or network-closet move succeeds when it is boring. Use this as a living checklist; assign an owner to every section.

Phase 0 — Freeze the truth (1–3 weeks out)

Phase 1 — Target site readiness (before anything rolls)

  1. Power: circuits, phase, PDU layout, redundancy tested under load if possible
  2. Cooling: capacity vs expected heat; hot/cold aisle confirmed
  3. Space: rails, ladder rack, fiber tray, grounding
  4. Network handoff: carrier demarcs, cross-connects, LOA/CFA complete
  5. OOB/management path available independently of production data plane
  6. Security access for the install team during the window

Gate: No truck leaves until power + cooling + demarcs are signed off.

Phase 2 — Move kit and logistics

Phase 3 — Cutover order (do not improvise at 2 AM)

  1. OOB / management / security appliances that unlock the rest
  2. Core / spine
  3. Distribution / leaf
  4. Services (DNS, auth, firewalls, load balancers) per dependency map
  5. Access layers and endpoints last

Each layer: bring up → verify → only then proceed. Time-box each gate; if a gate fails, execute the written backout — do not "push through."

Phase 4 — Verification pack

Phase 5 — Decommission

Nettech supports pre-move audits, config capture, spares, and staged bring-up. Plan a move with us · We buy surplus gear