Pre-Installation Checks

Bench checklist before anything hits the rack: identity, power, optics, firmware, licenses, and config staging that kills most day-one failures.

If you only rack and hope, you will rework. Run this list on the bench (or in receiving) before a device goes into a production rack. Every line exists because it has failed someone in the field.

A. Identity — does the box match the job?

B. Power and environment

C. Optics and cabling (the silent killers)

D. Software and licensing — power up off the rack

  1. Bench power-on; confirm POST and fans normal.
  2. Record current software version; compare to your approved baseline.
  3. Upgrade on the bench when possible — never discover a multi-hour upgrade in a maintenance window.
  4. Confirm license state (show license / smart licensing / traditional PAKs as applicable). A "dead" feature is often an unactivated entitlement.
  5. If RMA or used/refurb: verify serial and support eligibility against your process.

E. Configuration staging

F. Day-of install quick gate

  1. Photo of rack position before and after.
  2. Uplinks connected and up before mass access cabling.
  3. Management reachable from the NOC path.
  4. copy run start and off-box backup.
  5. Change ticket updated with serials and final hostname.